499 sq ft · Studio · 1 ba
Studio
Temecula · Plan 14602
About 29'4" × 17' — we derived this from the floor area

Temecula, Riverside County
Enter your address and we will draw your real parcel boundary, subtract the setbacks and your existing house, and show you what is actually left to build on. Then you can drag any of Temecula's 5 pre-approved plans onto it.
Aerial: USGS/USDA NAIP
Local context
Lots of HOA communities, plus larger wine-country parcels on the east side. HOAs cannot block an ADU under state law, but architectural review still adds friction.
Temecula permitted 14 ADUs in 2025, against 13 in 2023. Source: state Housing Element annual progress reporting.
The standards
Every figure shows its source. Read from TMC Ch. 17.23 (Ord. 2025-06).
| Standard | Value | Source |
|---|---|---|
| Side setback | 4 ft | Temecula code |
| Rear setback | 4 ft | Temecula code |
| Detached height | 16 ft 18 ft near transit; 20 ft if you match the roof pitch of the main house | Temecula code |
| Size the city must allow | 800 sq ft Cities cannot prohibit at least this size | California minimum |
| Largest detached ADU allowed | 1200 sq ft | Temecula code |
| Distance from your house | 6 ft Measured exterior wall to exterior wall. Waived where applying it would prevent an 800 sq ft ADU with 4 ft side and rear setbacks. | Temecula code |
| Parking | 1 space per unit Subject to the state transit exemptions | Temecula code |
| Shortest rental allowed | 31 days | Temecula code |
| Junior ADU maximum | 500 sq ft Minimum 150 sq ft | Temecula code |
| Decision deadline | 60 days Gov. Code 66317; 7–10 business days for an unmodified PRADU | Temecula code |
| Owner-occupancy required | No | California minimum |
| HOA can prohibit an ADU | No Gov. Code §66315. Reasonable architectural standards still apply. | California minimum |
| Impact fees | Waived under 750 sq ft A real reason to consider staying just under the threshold. | California minimum |
| Pre-approved plan review | 30 days, ministerial AB 1332. No discretionary review, no hearing. | California minimum |
Anything Temecula publishes inconsistently is left off this table rather than guessed at. Where that happens we say so in the notes above.
Conflicting sources
We read the adopted code against the PDFs handed out at the counter. They do not match, and planning around the handout can cost real money.
The handout says
Temecula’s ADU handout says you must live on the property.
The code says
The adopted ordinance imposes owner-occupancy only on junior ADUs, not on a standard ADU. AB 976 made the statewide prohibition on owner-occupancy requirements permanent.
Handout PL-73 (rev. 01/29/26) vs. TMC Ch. 17.23, Ord. 2025-06
The adopted ordinance governs. If a counter answer conflicts with it, ask which section they are relying on.
5 designs Temecula has already reviewed, drawn to the same scale.
499 sq ft · Studio · 1 ba
Temecula · Plan 14602
About 29'4" × 17' — we derived this from the floor area
625 sq ft · 1 bd · 1 ba
Temecula · Plan 14603
36'9" × 17' footprint, from the plan sheet
749 sq ft · 1 bd · 1 ba
Temecula · Plan 14604
44' × 17' footprint, from the plan sheet
909 sq ft · 2 bd · 2 ba
Temecula · Plan 14605
40' × 31' envelope — the building is L-shaped
1,194 sq ft · 3 bd · 2 ba
Temecula · Plan 14606
37'8" × 35' envelope — the building is L-shaped
400 sq ft · Studio · 1 ba
Any city
About 20' × 20' — we derived this from the floor area
600 sq ft · 1 bd · 1 ba
Any city
About 25' × 24' — we derived this from the floor area
800 sq ft · 2 bd · 1 ba
Any city
About 31' × 26' — we derived this from the floor area
1,000 sq ft · 2 bd · 2 ba
Any city
About 33' × 30' — we derived this from the floor area
1,200 sq ft · 3 bd · 2 ba
Any city
About 40' × 30' — we derived this from the floor area
Via the PRADU (Permit Ready ADU). A pre-approved plan is reviewed ministerially in 30 days — no hearing, no neighbour objection. Unmodified plans reviewed in 7–10 business days.
Where a footprint is marked approximate we derived it from the published floor area and use it only for siting geometry, never as the building design.
Before you spend
The geometry is usually the easy part. These are the issues that actually kill projects here.
Several communities here carry a Temecula mailing address while sitting in unincorporated Riverside County — which means county permitting, under different standards and timelines.
The single most common planning mistake in this area, and worth two minutes to confirm before you pay anyone for drawings.
By neighborhood
Build era, lot depth, septic versus sewer, association rules and fire zone status all change the answer, and they change neighborhood by neighborhood rather than city-wide. Here is what we know about yours.
Your real lot shape from the Riverside County Assessor, not a square around a pin.
Temecula's setbacks, your house, and the clearance between buildings. Green is what is left.
Fits, tight, or unlikely — and the best position we can find for it, not wherever you dropped it.
A report on your own parcel, in about a minute, before we ask you for anything.
FitsStudio, 499 sq ft
Next: a call to walk through it, then one screened local builder if you want quotes. What it costs.
Computed for an ordinary 60 × 120 ft tract lot with a 40 × 46 ft house, using Temecula's own setback and separation. Your figures come from your own parcel.
California requires every city, Temecula included, to allow an ADU of at least 800 square feet. Whether that size fits on your lot after setbacks and the separation from your existing house is a different question entirely, and it depends on your parcel rather than on the city. That is what the tool answers.
For a new detached ADU, state law caps the side and rear setback at 4 feet, so Temecula cannot require more. We apply that to your parcel boundary. One honest limitation: we erode the parcel evenly rather than identifying which edge fronts the street, which makes the buildable zone slightly generous at the front — so we disallow front-yard placement in the tool entirely.
No. Government Code section 66315 voids HOA covenants that prohibit or unreasonably restrict an ADU on a single-family lot. Your association can still apply reasonable architectural standards, and in practice that means an architectural committee submission running in parallel with your city permit. Budget calendar time, not a fight. Submit to both at once rather than waiting for one to finish.
No. AB 976 made the prohibition on owner-occupancy requirements permanent, so neither Temecula nor the state can require you to live in either unit.
Building an ADU triggers a reassessment of the new construction only, not of your existing home. Your original Proposition 13 base year value on the house is not disturbed. The assessor adds the value of what you built. We are working on a Temecula-specific breakdown including how this interacts with any existing special district assessments on your parcel.
One licensed builder, exclusive to Temecula, and we tell you who they are before we introduce you. We are not a contractor and we do not take a cut of your build — we are paid for the introduction, which is why we have no incentive to talk you into a bigger project than your lot supports.
Free. You see the result before we ask for anything.