Check my lot

Romoland, Menifee, CA

Adding an ADU in Romoland

Romoland is the older semi-rural northeast corner of Menifee, with good lot sizes and minimal association involvement.

Much of what is now the Heritage Lake development was built in what was historically Romoland, so the name covers both older rural parcels and newer tract housing.

  • Free
  • No account
  • No phone number
  • Your result first

Aerial: USGS/USDA NAIP

Before you spend

What to know before you spend anything

Septic is likely on parts of the older rural stock.

The basics

Romoland at a glance

Built
Older semi-rural
Homeowners association
Minimal
Lots
Larger semi-rural parcels
ZIP
92585

We publish only what we verified. Lot dimensions vary enough inside a single tract that a neighborhood average would mislead you, so the tool reads your own parcel instead.

Why two Romoland lots the same size answer differently

Both of these are 7,200 sq ft with the same 40 × 46 ft house, under Menifee's rules. The only difference is the shape, and it changes the answer.

60 ft wide, 120 ft deep

Fits1 Bedroom 1B

Buildable after setbacks
2,858 sq ft
Plans that fit
5 of 12

90 ft wide, 80 ft deep

Unlikely1 Bedroom 1B

Buildable after setbacks
2,938 sq ft
Plans that fit
0 of 12

Two made-up lots, but not made-up numbers: the green area, the fit verdicts and the plan counts are computed with Menifee's own 4 ft setback and 6 ft separation by the same functions the lot tool runs on a real parcel. Your lot is not either of these, which is the point — we read yours.

Measure my actual lot

Honest limits

What the geometry check can and cannot tell you

Why three answers, not yes or no

  • Public parcel lines sit 3 to 25 ft from the surveyed boundary.
  • The setback being measured is only 4 ft.
  • When the error bar is wider than the measurement, "yes" is a guess. So: Fits Tight Unlikely

What public data cannot see

  • Easements through the rear yard
  • Slope
  • Sewer or septic capacity
  • Electrical panel capacity
  • Soil conditions

Any one of these can stop a project that passes the geometry check.

On a tight lot, studio b needs about 15 by 20 ft of clear space — and staying under 750 sq ft waives impact fees entirely.

Nearby

Other Menifee neighborhoods

All Menifee ADU rules and plans

See what fits on your Romoland lot

Free. You see the result before we ask for anything.